Phase 5 of the building process is where the exciting part of the construction begins.

Framing a home

Framing

Activities that occur during this stage include:

• Framing
• Fireplace install
• Roof Dry In
• Gutter and Downspouts
• Window Install
• Plumbing Rough
• Mechanical Rough
• Plumbing and Mechanical Inspection
• Electrical Walk Through
• Electrical Rough
• Electrical Inspection
• Electrical Service
• Garage Doors Installed
• Stucco/Masonry Lathe
• Phone/AV/Cable Wiring
• Radiant Tube Install (if applicable)
• Pour Lightweight concrete (if applicable)
• Frame Inspection
• Insulation
• Insulation Inspection
• Drywall
• Shelving
• Stucco Brown Coat
• Paint Exterior
• Masonry Exterior